|
Issue |
Title |
|
Vol 6, No 1 (2024): April |
A MODIFICATION LIMIT EQUILIBRUM SOLUTION FOR MINE BACKFILL ANALYSIS IN SEMI CUBE STOPE |
Abstract
PDF
|
Ashabul Kahfi, Revia Oktaviani, Shalaho Dina Devy |
|
Vol 1, No 1 (2019): NOVEMBER |
Activated Sludge Technology to Treat Wastewater from Offices and Residential Areas PT Kaltim Prima Coal |
Abstract
PDF
|
Kris Pranoto, Widia Rahmawati Pahilda, Muhammad Sonny Abfertiawan, Apridawati Elistyandari, Andi Sutikno |
|
Vol 4, No 1 (2022): April |
ADSORPSI ION LOGAM Fe3+ DALAM AIR ASAM TAMBANG MENGGUNAKAN NANO ZEOLIT ALAM |
Abstract
PDF
|
Yulianis Yulianis, Riskal Husna, Novita Devi Irviani Zulva, Mahidin Mahidin |
|
Vol 4, No 2 (2022): November |
ANALISIS ALTERNATIF PEMILIHAN BUCKET TOOTH UNIT EXCAVATOR HITACHI EX3600 DI PT. KALTIM PRIMA COAL (KPC) DENGAN PENDEKATAN LIFE CYCLE COST |
Abstract
PDF
|
Hari Sasongko Lelono |
|
Vol 2, No 1 (2020): April |
ANALISIS DAMPAK INVESTASI TERHADAP PEREKONOMIAN DAERAH: STUDI KASUS INVESTASI PERTAMBANGAN MINERAL LOGAM PROVINSI PAPUA |
Abstract
PDF
|
Fadhila Achmadi Rosyid, Fandi Arapenta Ginting, Arjo Prawoto Wibowo |
|
Vol 5, No 1 (2023): April |
ANALISIS KONSUMSI BAHAN BAKAR ALAT ANGKUT UD QUESTER CWE 370 DALAM KEGIATAN PENGANGKUTAN BIJIH NIKEL |
Abstract
PDF
|
Hendra Rujiadi Adha |
|
Vol 4, No 2 (2022): November |
ANALISIS PEMBENTUKAN TANAH DARI BATUAN PENUTUP OVERBURDEN PADA AREA REKLAMASI PT BORNEO INDOBARA GUNA MENDUKUNG KEBERHASILAN REKLAMASI SECARA BERKELANJUTAN |
Abstract
PDF
|
Yudha HES, Kinanto Prabu, Vina Delya |
|
Vol 4, No 2 (2022): November |
ANALISIS RESIKO KERUNTUHAN LERENG MENGGUNAKAN DISCONTINUITY MAPPING-REMOTE SENSING DAN ANALISIS KINEMATIK DI PIT C2HS, SAMBARATA MINE OPERATION, PT BERAU COAL |
Abstract
PDF
|
Yuzar Chairil Firmansyah, Dinefa Yuslima Syaumi, Lukman Hakim |
|
Vol 1, No 1 (2019): NOVEMBER |
Analysis of Carbon Monoxide Gas Dilution on Horizontal Tunnel Front using Laboratory Scale Physical Model |
Abstract
PDF
|
Addien Wisnu Harnoko, Nuhindro Priagung Widodo, Ahmad Ihsan |
|
Vol 2, No 1 (2020): April |
Dynamic Analysis of Blasting Effect on Nanjung Tunnel Stability |
Abstract
PDF
|
Alio Jasipto, Nuhindro Priagung Widodo, Ganda Marihot Simangunsong, Simon Heru Prasesetyo, Made Astawa Rai, Dhika Noor Pradhana, Dimas Agung Saputra |
|
Vol 6, No 1 (2024): April |
EVALUASI ANALISIS GEOTEKNIK PADA TAMBANG TERBUKA BATUBARA PIT NORTH WEST PT ANAK TAMBANG INDONESIA JOB SITE PT ADIMITRA BARATAMA NUSANTARA, KALIMANTAN TIMUR |
Abstract
PDF
|
Vinsentia Parissing, Sundek Hariyadi, Singgih Saptono, Barlian Dwinagara |
|
Vol 5, No 1 (2023): April |
EVALUASI DAN RANCANGAN GEOMETRI HAULING ROADS PADA LOKASI PENAMBANGAN ASPAL |
Abstract
PDF
|
La Ode Dzakir |
|
Vol 5, No 2 (2023): November |
EVALUASI HAUL ROAD DESIGN DAN OPERASI TAMBANG DILIHAT DARI ASPEK MAINTENANCE DENGAN MINECARE REAL-TIME ANALYSIS STUDY CASE PT KALTIM PRIMA COAL |
Abstract
PDF
|
Harry Rahmaddian, Bustanil Arifin |
|
Vol 1, No 1 (2019): NOVEMBER |
Geotechnical Study of The Impact of Groundwater Level For Slope Stability in Coal Mine |
Abstract
PDF
|
Jioni Santo Frans, Muhammad Hafizh Nurfalaq |
|
Vol 2, No 2 (2020): November |
IDENTIFIKASI ZONA KAYA KOBALT PADA CEBAKAN NIKEL LATERIT DI INDONESIA |
Abstract
PDF
|
Nur Anbiyak, Tyas Cahyaningrum |
|
Vol 3, No 1 (2021): April |
IMPLEMENTASI BOTTOM AIR DECK DAN EXPAND PATTERN SECARA TERINTEGRASI DALAM RANGKA OPTIMALISASI PENGGUNAAN BAHAN PELEDAK DI PIT SOUTH PINANG PT. KALTIM PRIMA COAL |
Abstract
PDF
|
Masda Rohal Sadiq |
|
Vol 4, No 2 (2022): November |
IMPLEMENTASI PROGRAM “TAKE-5” UNTUK MENGURANGI POTENSI PENGGALIAN KERAS PADA ALAT GALI MUAT DI PIT BENDILI PT KALTIM PRIMA COAL |
Abstract
PDF
|
Fadli Fadli |
|
Vol 1, No 1 (2019): NOVEMBER |
Implementation Of Permen Esdm No. 17/2012 As A Solution Between Mineral Businessesand Conservation Karst Zone In Indonesia |
Abstract
PDF
|
Aris Dwi Nugroho, Tantan Hidayat, Muhammad Wachyudi Memed |
|
Vol 2, No 2 (2020): November |
IMPORTANCE OF THIN SEAMS RECONCILIATION IN A NEW COAL MINING PROSPECT AREA |
Abstract
PDF
|
Ali Achmad |
|
Vol 6, No 1 (2024): April |
INOVASI TEKNOLOGI UNTUK KONSERVASI SUMBERDAYA MINERAL: TANTANGAN DAN PELUANG |
Abstract
PDF
|
Ibnu Mabruri |
|
Vol 4, No 1 (2022): April |
INVENTORI ANALITIK: PENENTUAN JUMLAH KATEGORISASI RAW MATERIAL PALING OPTIMAL DENGAN MENGGABUNGKAN METODE WEIGHTED K-MEANS DAN FUZZY C MEANS (ALGORITMA PEMBELAJARAN TANPA PENGAWASAN) PADA DATA MULTIDIMENSI KUALITAS BATUBARA |
Abstract
PDF
|
Yoga P. Adiwiguna, Mohamad N. Saleh, Hadi Syuhara, Hario Purbaseno, Almira D. Kusuma |
|
Vol 2, No 2 (2020): November |
INVESTIGASI DAN REKAYASA TAPAK REKLAMASI: STATE OF ART SUATU SOLUSI UNTUK MENUNJANG PASCATAMBANG TIMAH ALLUVIAL YANG BERKELANJUTAN |
Abstract
PDF
|
Budi Sulistijo, Chusharini Chamid, Adriyanto D Kusumo |
|
Vol 5, No 1 (2023): April |
KAJIAN TEKNIS PRODUKSI ALAT MUAT DAN ALAT ANGKUT PADA KEGIATAN PENAMBANGAN BATUBARA |
Abstract
PDF
|
muhammad dafa ramadhan |
|
Vol 4, No 2 (2022): November |
KOMPARASI PENGAMBILAN DATA TOPOGRAFI STOCKPILE DI ROM MENGGUNAKAN WAHANA UNMANNED AERIAL VEHICLE DAN GPS RTK TIPE GEODETIC |
Abstract
PDF
|
Ryan Nugraha |
|
Vol 1, No 1 (2019): NOVEMBER |
Linier Superposition Analysis on Managing Blasting Ground Vibration in Coal Mining |
Abstract
PDF
|
Dhion Pradatama, Chani Pradasara, Syarif Nurdiansyah |
|
1 - 25 of 64 Items |
1 2 3 > >> |