| Issue | Title | |
| Vol 4, No 2 (2022): November | PREDIKSI JARAK LEMPARAN FLYROCK DENGAN METODE ANALISIS DIMENSI SERTA RICHARD DAN MOORE AKIBAT KEGIATAN PELEDAKAN PADA TAMBANG BIJIH EMAS | Abstract PDF |
| Dea Al Zhahra, Bagus Wiyono, Anton Sudiyanto | ||
| Vol 3, No 1 (2021): April | PURCHASING STRATEGIES IN THE KRALJIC PORTFOLIO MATRIX – A CASE STUDY IN OPEN PIT COAL MINING | Abstract PDF |
| Alim Perdana, Nur Budi Mulyono | ||
| Vol 6, No 1 (2024): April | RANCANGAN GEOMETRI SALURAN TERBUKA DENGAN VALIDASI PEMODELAN GENANGAN SOFTWARE HEC – RAS | Abstract PDF |
| Adyaksa Bagas Bimantoro, Tedy Agung Cahyadi, Tedy Agung Cahyadi, Peter Eka Rosadi, Gunawan Nusanto, Wawong Dwi Ratminah, Achmad Riyadi | ||
| Vol 4, No 2 (2022): November | REAL TIME HAUL ROAD CONDITION MONITORING STUDI PT KALTIM PRIMA COAL | Abstract PDF |
| Bustanil Arifin, Ilham Mubaroq | ||
| Vol 2, No 1 (2020): April | Rock strength analysis due to discontinuity and grouting | Abstract PDF |
| Nur Alam Syah Rahman, Ganda Marihot Simangunsong, Irwandi Arif | ||
| Vol 2, No 2 (2020): November | SISTEM PERINGATAN DINI: PEMANTAUAN LERENG TAMBANG MENGGUNAKAN APLIKASI TELEGRAM | Abstract PDF |
| Priema Wardani, Zidni Ilman Munthaha | ||
| Vol 1, No 1 (2019): NOVEMBER | Stability Analysis of the Nanjung Water Diversion Twin Tunnels based on Convergence Measurement | Abstract PDF |
| Simon Heru Prassetyo, Ganda Marihot Simangunsong, Ridho Kresna Wattimena, Made Astawa Rai, Irwandy Arif, Nuhindro Priagung Widodo, Dhika Noor Pradhana, Dimas Agung Saputra | ||
| Vol 4, No 2 (2022): November | STRATEGIC PLAN PENAMBANGAN BATUBARA PADA BATUAN DENGAN TSS TINGGI DI PIT C1 BLOK 8 PT BERAU COAL | Abstract PDF |
| Saeful Aziz, Ida Wayan Supriharta, Gregorius Dante, Pandu Zea Ardiansyah, Andi Nugroho, Aprian Krisna Bhakti, Prasetya Heriyan Saputra | ||
| Vol 3, No 1 (2021): April | STRUCTURAL GEOLOGY FAULT EFFECT ON HIGHWALL COAL MINING AND FAILURE EVALUATION BASED ON VELOCITY DATA AT BENGALON, EAST-KUTAI DISTRIC, EAST KALIMANTAN PROVINCE. | Abstract PDF |
| Muh Arif Idhan, Gina Audina Alhabsyi, Muhammad Ikbal | ||
| Vol 2, No 1 (2020): April | STUDI PENGARUH GEOMETRI LERENG PADA ANALISIS KEMANTAPAN LERENG 2D DAN 3D DENGAN METODE KESETIMBANGAN BATAS | Abstract PDF |
| Muhammad Zaini Arief | ||
| Vol 2, No 1 (2020): April | STUDI PENGARUH UKURAN BUTIR BATUBARA DAN TINGKAT KEPADATAN BATUBARA TERHADAP POTENSI PEMBAKARAN SPONTAN PADA SKALA LABORATORIUM Study of the Effect of Coal Grain Size and Coal Compaction to the Spontaneous Combustion Potential at Laboratory Scale | Abstract PDF |
| Nuhindro P Widodo | ||
| Vol 5, No 2 (2023): November | THE HARMONIZING MINE PLANNING IN THE EAST KALIMANTAN COKING COAL MINE: THE CHALLENGES AND IMPROVEMENTS | Abstract PDF |
| Ashabul Kahfi, Dwi P. Fransiskus, Wijanarko K. Adi, Ahmad Prayogi, Luqman S. Purwosasongko | ||
| Vol 1, No 1 (2019): NOVEMBER | Vibration Management for Slope Stability with “Signature Hole Analysis†Method in Open Pit Blasting Activity | Abstract PDF |
| Muhammad Syafiq Isnaya, Muhammad Fadil Bellico, Dwi Agung Priyanggoro | ||
| Vol 4, No 2 (2022): November | Zonasi Rawan Gerakan Massa Berbasis GIS dan Integrasi Aplikasi Manajemen Bencana Berbasis Crowdsourcing di Area Pertambangan Emas Pongkor, Jawa Barat | Abstract PDF |
| Bagaskara Widi Nugroho, Deden Rojudin, Muhammad Chaidir Harist, Hafiidh Alfian Affandi | ||
| 51 - 64 of 64 Items | << < 1 2 3 | |

.png)


.png)








